One of the Scrum events is the Daily Scrum. What are two intended outcomes of the Daily Scrum? (Choose two.)
Correct Answer:AE
How much of the Sprint Backlog must be defined during the Sprint Planning event?
Correct Answer:C
Which two things are appropriate for a Scrum Master to do if the Development Team doesn’t have the engineering tools and infrastructure to completely finish each selected Product Backlog item? (Choose two.)
Correct Answer:AE
Why is the Daily Scrum held at the same time and same place?
Correct Answer:A
Which of the following are roles on a Scrum Team? (Choose all that apply.)
Correct Answer:BCD
For which is the Scrum Master responsible?
Correct Answer:C