- (Topic 1)
A project manager should document the escalation path for unresolved project risks in the:
Correct Answer:D
- (Topic 2)
Which type of probability distribution is used to represent uncertain events such as the outcome of a test or a possible scenario in a decision tree?
Correct Answer:C
- (Topic 2)
Activity cost estimates and the project schedule are inputs to which Project Cost Management process?
Correct Answer:D
- (Topic 3)
Assigned risk ratings are based upon:
Correct Answer:B
- (Topic 4)
Which of the following is a tool or technique of the Define Activities process?
Correct Answer:A
- (Topic 1)
Using values such as scope, cost, budget, and duration or measures of scale such as size, weight, and complexity from a previous similar project as the basis for estimating the same parameter or measurement for a current project describes which type of estimating?
Correct Answer:C