Question 73

- (Exam Topic 17)
Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

Correct Answer:A

Question 74

- (Exam Topic 23)
Testing effort can depend on a number of factors, which one of following is MOST likely to impact the amount of effort required?

Correct Answer:C

Question 75

- (Exam Topic 21)
One of the roles in a review is that of moderator, which of the following best describes this role?

Correct Answer:A

Question 76

- (Exam Topic 21)
What is the concept of introducing a small change to the program and having theeffects of that change show up in some test..?

Correct Answer:A

Question 77

- (Exam Topic 23)
Which of the following is NOT a valid objective of testing?

Correct Answer:D

Question 78

- (Exam Topic 15)
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
* a. Any deviation from the procedures described in the test
* b. strategy document
* c. The overall estimated costs, timescales and resource
* d. requirements
* e. A detailed schedule of testing activities
* f. The development deliverables to be tested
* g. Which test staff members (names) will be involved and when
* h. Level of requirements coverage achieved
Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit

Correct Answer:CE