The primary objective in removal of waste is to improve the Order Production Cycle where the time from ______ to the time of receipt of payment is compressed.
Correct Answer:C
Which of these are examples of business metrics or Key Performance Indicators commonly referred to as KPI’s?
Correct Answer:E
The method of Steepest Ascent guides you toward a target inside the original inference space.
Correct Answer:B
In a good Measurement System the most variation will be with part-to-part measurements. What should you do if the majority of variation is associated with the Gage R&R assuming the gage is technically capable?
Correct Answer:A
Fractional Factorial, ______ and Response Surface Method are types of planned experiments.
Correct Answer:D
The Japanese born function of a Kanban event utilizes a specific, step-by-step approach meant to bring about major changes to a process.
Correct Answer:B