A customer has just implemented user and device certificates via a company-wide Group Based Policy (GPO) Which EAP method requires client certificates when authenticating to the network?
Correct Answer:B
EAP-TLS is an authentication method that requires client certificates when authenticating to the network. It provides mutual authentication between the client and the server using public key cryptography and digital certificates. References:https://www.arubanetworks.com/techdocs/ClearPass/6.9/Guest/Content/CPPM
_UserGuide/EAP-TLS/EAP-TLS.htm
What is the correct command to add a static route to a class-c-network 10.2.10.0 via a gateway of 172.16.1.1?
Correct Answer:A
The correct command to add a static route to a class-c-network 10.2.10.0 via a gateway of 172.16.1.1 is ip-route 10.2.10.0/24 172.16.1.1 . This command specifies the destination network address (10.2.10.0) and prefix length (/24) and the next-hop address
(172.16.1 .1) for reaching that network from the switch. The other commands are either incorrect syntax or incorrect parameters for adding a static route. References:https://www.arubanetworks.com/techdocs/AOS- CX_10_04/NOSCG/Content/cx-noscg/ip-routing/static-routes.htm
You have been asked to onboard a new Aruba 6300M in a customer deployment You are working remotely rather than on-site You have a colleague installing the switch The colleague has provided you with a remote console session to configure the edge switch You have been asked to configure a link aggregation going back to the cores using interfaces 1/1/51 and 1/1/52 The Senior Engineer of the project has asked you to configure the switch and 1Q uplink with these guidelines
* 1. Add VLAN 20 to the local VLAN database with name Mgmt
* 2. Add L3 SVl on VLAN 20 for Management using address 10 in the 10.1.1 0/24 subnet 3. Add LAG 1 using LACP mode active for the uplink
* 4 use vlan 20 as the native vlan on the LAG 5. Make sure the interfaces are all ON. Which configuration script will achieve the task?
Correct Answer:C
This configuration script will achieve the task as it follows the guidelines given by the Senior Engineer. It creates VLAN 20 with name Mgmt, adds L3 SVI on VLAN 20 with IP address 10.1.1.10/24, creates LAG 1 with LACP mode active for the uplink, uses VLAN 20 as the native VLAN on the LAG, and ensures that the interfaces are all ON. References:https://www.arubanetworks.com/techdocs/AOS-CX/10.04/HTML/5200- 6790/GUID-8F0E7E8B-0F4B-4A3C-AE7F-0F1B5A7F9C5D.html