Which list of levels of tester independence is in the correct order, starting with the most independent first?
Correct Answer:C
This option has someone nearer to the written code in each statement. All other options are not in this order.
In addition to risk, identify TWO other components of a testing strategy. 1 credit
Correct Answer:AC
A test management tool is most likely to integrate with which of the following tools?
Correct Answer:D
Requirements management tools (option (D)) often have interfaces with test management tools. In some cases they will be sold as a package or in other cases a test management tool may have its own requirements module. The use of such interfaces or integrated packages aids traceability from requirements through to test scripts and defects.
Performance management tools (option (A)), test data preparation tools (option (B)) and static analysis tools (option (C)) are unlikely to have an interface or be integrated with a test management tool. They serve different purposes and therefore there is little need for such interfaces.
You have been asked to write a testing strategy for the company. Which statement best explains how risk can be addressed within the testing strategy? 1 credit
Correct Answer:A
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
Correct Answer:ABD
Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits
Correct Answer:AC