You are testing a major enhancement to an air traffic control user interface. You have use of a sophisticated pre-production test environment, created specifically for large scale automated regression, performance and security testing. The window for regression testing is limited and must successfully conclude, with no major regressions remaining, before the non-functional testing starts.
You have been using the same version of the TAS for the last few releases, each time completing the automated regression test suite in a single overnight run. However, due to the latest enhancements for the SUT, you believe there is a risk that the test suite may no longer complete
overnight and therefore delay performance and security testing.
Which option would be the BEST and MOST cost-efficient approach to mitigate this risk?
Correct Answer:A
Reference: https://www.guru99.com/regression-testing.html
You are using a gTAA to create a TAS for a project. The TAS is aimed at automatically and executing test cases based on a use-case
Modeling approaching that uses UML as a modeling language. All the interaction between TAS and SUT will only be at the API and GUI level.
Which of the following components of the gTAA would you EXCLUDE from the TAS?
Correct Answer:D
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of thesystem (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?
Correct Answer:D
Your functional regression test automation suite ran successfully for the first two sprints and no failures were encountered during the runs. The automation suite records the status of each test case as either 'pass' or 'fail' and has excellent recovery capability built in.
For the third sprint, the TAS log reported several test cases with a status of 'fail'. You investigated each test case and found that most failures were due to a defect in one of the keyword scripts, rather than in the SUT. For those where the failure was in the SUT, defectreports were raised but several were returned by the developers asking for more information to enable them to reproduce the problem.
Which additional log items SHOULD you add to the TAS that would BEST improve failure analysis and defect reporting for future sprints?
a) Dynamic measurement information about the SUT.
b) A status of TAS error??, in additional to pass' and 'fail', for each test case.
c) Use of a colour coding scheme so that 'pass?? is in red and fail' is in green.
d) A counter to determine how many times each test case has been executed.
e) System configuration information including software/firmware and operating system versions.
f) A copy of the source code for all Keyword scripts executed.
Correct Answer:B
As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT??s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
A) Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
B) Does the test automation tool support a licensing scheme that allows accessing different sets?
C) Does the test automation tool have a large feature set, but only part of the features
will be sets?
D) Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?
Correct Answer:C
You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?
Correct Answer:C