What occurs by default when a Desktop Requisition with one direct issue line is submitted?
Correct Answer:C
In the Work Order Tracking application, when using the Select Value on the Safety Plans field from where can the safety plan be derived?
Correct Answer:D
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?
Correct Answer:CD
When reconciling current inventory balances with physical counts, which two Inventory Usage transactions performed since the physical count are considered when calculating the current balance? (Choose two.)
Correct Answer:AB
What combination of information on a Work Order is used to create a histogram in the Graphical Scheduling application?
Correct Answer:C
The Graphical Scheduling application in Maximo Manage v8.0 uses histograms to provide a visual representation of resource allocation. To generate these histograms for work orders, it relies on the following information:
✑ Craft Quantity: This refers to the number of personnel from a specific craft (e.g.,
electricians, mechanics) required to complete the work order.
✑ Hours: This represents the total number of hours that the specified craft is needed for the work order.
By combining these two pieces of information, the histogram displays the overall workload demand for each craft across the scheduled work orders. This allows schedulers to:
✑ Identify potential resource bottlenecks: See if there are periods where the demand
for a particular craft exceeds its availability.
✑ Optimize resource allocation: Allocate crafts effectively to ensure that enough personnel are available to complete the work within the scheduled timeframe.
✑ Balance workloads: Distribute work among crafts to avoid overloading specific teams. (Reference: IBM Maximo Manage v8.0 documentation - Graphical Scheduling application)
In which Maximo add-on can the Build Data Interpreter (BDI) be found?
Correct Answer:B